The "Dodo-Postcards" watermark is NOT on the actual card – it is an online watermark only.
Construction of Second Adit at Lower Shakespeare Cliff Site. The Channel Tunnel Group. Series. 1. No. 2
Series 1 No. 2. Construction of Second Adit at Lower Shakespeare Cliff Site. November. 1987. Euro Tunnel. 1988. Channel Tunnel Group Limited
Lower Shakespeare Cliff Site. February 1988. Euro Tunnel. Series 1 No. 3. Channel Tunnel Group Limited
Lower Shakespeare Cliff Site. The Channel Tunnel Group. Euro Tunnel Post Card
Locomotive in Service Tunnel. Lower Shakespeare Cliff Site. The Channel Tunnel Group
Tunnel workings at lower Shakespeare cliff site. The Road Header machine. The Channel Tunnel Group Ltd
Tunnel Workings at Lower Shakespeare Cliff Site. May 1988. The Road Header Machine. Channel Tunnel Group Limited. Euro Tunnel
Lower Shakespeare Cliffe Site. From this Site the Service Tunnel and Two Running Tunnels Will be Driven Towards France and Folkestone. The Channel Tunnel Group. Series. 1. Mo. 3. 1990