The "Dodo-Postcards" watermark is NOT on the actual card – it is an online watermark only.
Tunnel Workings at Lower Shakespeare Cliff Site. May 1988. The Road Header Machine. Channel Tunnel Group Limited. Euro Tunnel
Construction of Second Adit at Lower Shakespeare Cliff Site. The Channel Tunnel Group. Series. 1. No. 2
Series 1 No. 2. Construction of Second Adit at Lower Shakespeare Cliff Site. November. 1987. Euro Tunnel. 1988. Channel Tunnel Group Limited
Lower Shakespeare Cliff Site. February 1988. Euro Tunnel. Series 1 No. 3. Channel Tunnel Group Limited
Lower Shakespeare Cliff Site. The Channel Tunnel Group. Euro Tunnel Post Card
Locomotive in Service Tunnel. Lower Shakespeare Cliff Site. The Channel Tunnel Group
Tunnel workings at lower Shakespeare cliff site. The Road Header machine. The Channel Tunnel Group Ltd
Lower Shakespeare Cliff Site. Construction of Second Adit 1987. The Channel Tunnel Group Limited 1988. PM. Folkestone. 1989